- Daily log
- The superintendent's day-by-day record of weather, crew counts, work performed, deliveries, visitors, and delays. It is the first document anyone reaches for when a schedule claim or a back-charge is questioned, and it is worth more filled in nightly than reconstructed at the end of the month.
- RFI (request for information)
- A formal question submitted to the design team when the drawings or specifications are unclear or appear to conflict. The answer becomes part of the contract documents, so the RFI needs a number, a date, and a clear description of what was unclear rather than a hallway conversation.
- Submittal
- Documentation of a proposed material, product, or method, submitted for the design team's approval before installation. The review cycle needs time in the schedule, and a submittal approved late is one of the quieter causes of a field delay.
- Punch list
- The itemized list of incomplete or defective work identified near project completion. Punch list items sit between substantial and final completion, and closing them is usually what unlocks the last retainage release.
- Drawings and drawing set
- The project's construction documents and their organized collection by discipline. The drawing set issued for construction is the reference the field works from, and every RFI should cite the sheet it is asking about.